Commercial Kitchen Floor Drain Requirements

4 diameter alterations greater than 50 shall have accessible water closets urinals and lavs.
Commercial kitchen floor drain requirements. They will more than likely be cutting the slab for plumbing anyway. Floor drains shall be installed in commercial kitchens floor shall slope to drain. The floor must have heat welded seams a minimum of 4 high with 3 8 self coved base. Drains for equipment are sometimes located when the floor is poured or block outs can be left for later installation.
It is similar to a floor drain as it is installed flush with the floor but has a much larger chamber to receive the indirect wastes and does have a strainer as called for in the plumbing code in addition to the grate. The item in the picture to the right is referred to as a floor sink. Floor sink as a waste receptor. Jun 13 2012 11 i m in ca and floor drains are required.
Enabling floor coating application in as little as seven days after a new concrete slab has been poured so you can be up and running more quickly. Satisfying all the criteria of the top five requirements above cementitious urethane mortar floors are an excellent choice in concrete protection for both new and existing commercial kitchen. In food prep areas fixture requirements may be dictated by the health codes. Joined oct 26 2009 messages 1 649 location state of disbelief.
Seamless troweled on epoxy floor not paint 1 4 minimum thickness with a 4 self coved base. Why wouldn t you want some type of floor drain in a commercial kitchen.